layout Details
Layout Photos
Trams
Tram Video
Setts Detail
Tram Depot Details
Pavement Details
Tenshodo Details
Wiring Diagram
Traffic signal
  Wiring Details
 

The track is sectioned in several places to allow more than one tram to be operated.

Click to open as PDF file

Panel Artwork for isolating switches

The artwork was modified to add two addtional isolating switches 6 and 7. This will allow upto four trams to be housed in the depot.

Click to open as PDF

For details on traffic signal Click here

BACK TO TOP

 


Copyright C. Ashton 2008 Last updated on April 11, 2012

 

 

 

Free Web Hosting