The track is sectioned in several places to allow more than one tram to be operated.
Panel Artwork for isolating switches
The artwork was modified to add two addtional isolating switches 6 and 7. This will allow upto four trams to be housed in the depot.
For details on traffic signal Click here
BACK TO TOP
|